2–4 m planning range
Measure the nearest and farthest positions. Review sample media at the proposed pitch; this range is not a certified minimum viewing distance.
KEDA LED / INDUSTRY SOLUTION
Create a clear focal point for welcome content, event directions and venue imagery. Plan a portrait LED poster for guest circulation, daylight and the lobby content workflow.
The model and distance range are planning starting points, subject to a project assessment. Imagery is independently generated and illustrates placement or product appearance.

01 / TECHNICAL ASSESSMENT
Measure the nearest and farthest positions. Review sample media at the proposed pitch; this range is not a certified minimum viewing distance.
Review glass entrances and evening lighting. Confirm a suitable brightness setting for each location and avoid distracting glare near reception.
Confirm base stability, cables, power and control. Joined units also need an approved layout and content map.
02 / APPLICATION PLANNING
Keep directions concise and prepare large, high-contrast text for the 416 × 1248 pixel active canvas. Evaluate content at the nearest viewing position before final pitch selection.
Keep the mobile base and power connection clear of check-in queues, accessible routes and emergency exits. Confirm the placement with the hotel facility team.
The source lists App, USB, Wi-Fi and Ethernet publishing. Specify who updates content, the network environment and whether the selected controller needs a cloud service or third-party integration.
03 / SOURCE SPECIFICATIONS
Values above are from the supplied HB-X brochure. Power figures are listed specifications; actual consumption depends on content and settings. Brightness, controller, packing and installation details are confirmed for the selected configuration.
04 / BUYER QUESTIONS
The brochure lists a 1.538 mm pitch and 416 × 1248 pixel active resolution for HB-X1.53. It is a starting point for lobby imagery and concise text, with the final model selected against viewing distance, lighting, artwork and budget.
App, USB, Wi-Fi and Ethernet publishing are listed in the source brochure. Confirm the supplied controller, user permissions, network requirements and any cloud subscription before committing to a remote publishing workflow.
A hotel-system API integration is not established by the supplied product specifications. Share the required data sources and security requirements so a separate integration scope can be assessed.
The factory has confirmed a warranty period of 2 years. The start date, coverage, service process, spare parts and freight responsibilities are confirmed in the order. Use the warranty page or contact the team for those terms.
FACTORY DIRECT / PROJECT QUOTATION
Send the viewing positions, location photos, sample content, quantity and destination. The quote form opens with the hotel lobby application and HB-X1.53 model selected.